Load Control

March 4th, 2015

Attn: Members on Load Control — Adams Electric Cooperative will be load controlling Thursday, March 5 from 6:00-9:00 a.m. and Thursday, March 5 from 6:00-8:30 p.m. All water heaters on Controlled Heating and Cooling (CHC) and Controlled Water Heating (CWH) will be turned “off” for the entire interruption period. If you have any questions regarding the interruptions, call Adams Electric at (800) 232-4797.

Adams Electric Cooperative
Mailing address: P.O. Box 247, Camp Point, IL 62320
Headquarters Location: 700 E. Wood St., Camp Point, IL
Phone: 217-593-7701 – Fax: 217-593-7120